1
Doc Info
2
Compressors
3
Utility Rates
4
Results & Export
01 Document Information
02 Compressors
# Name HP Hours/yr RF LF Eff (η) Pcurrent Pproposed
+ Compressor + 150HP 125 to 115 + 50HP 150 to 110 + 200HP 115 to 105
-
ℹ Each compressor can have its own HP, operating hours, running/loading factor, efficiency, and current/proposed pressure. Rule of thumb: ~1% savings per 2 psi reduction.
03 Utility Rates
ℹ Implementation

Cost: $0 - Payback: Immediate. This recommendation requires only adjusting the compressor's pressure set point. No material or labor costs apply. Reduce pressure gradually (2–5 psi at a time) and monitor equipment at each step.

04 Live Results
Add compressors & enter data
results update automatically
📄 Generate Word Report

Generates a complete .docx following the IAC assessment template - EC, LFf, EP, AES, DR, ACS equations per compressor.

∑ Formula Reference
EC = (HP × C₁ × H × RF × LF) / η
LFf = (Pf / Pc) × LFc
EP = (LFf / LFc) × EC
AES = EC − EP
DR = (AES / H) × 12 × Cf
ACS = AES × RE + DR × RD
C₁ = 0.746 kW/HP.
~1% savings per 2 psi reduction.
IC = $0, Payback = Immediate.