1
Doc Info
2
Current Fixtures
3
Proposed LEDs
4
Rates & Costs
5
Results & Export
01 Document Information
02 Current Fixtures (Table 1)
# Installation Area Fixture Config No. Fixtures Bulb W Fixture+Ballast W Op. Hrs/yr
+ Row + 2-Bulb T8 (74W) + 4-Bulb T8 (138W) + 6-Bulb T8 (202W) + MH 400W + MH 250W + HPS 250W
-
03 Proposed LED Fixtures (Table 2)
# Area / Config No. Bulbs Bulb W Op. Hrs/yr
+ Row
-
04 Utility Rates & Implementation Costs
Utility Rates
ℹ Set Coincidence Factor = 0 for outdoor-only (no demand charge). Default 0.77 per Focus on Energy TRM.
Implementation Costs
⚠ Use either per-fixture or per-watt FoE incentive - set the unused one to 0.
05 Live Results
Enter fixture data
results update automatically
📄 Generate Word Report

Generates a complete .docx following the IAC LED assessment template - tables, equations, summary box, lifespan section.

∑ Formula Reference
Ec = Σ(N × Wc × H) / 1000
Ep = Σ(N × Wp × H) / 1000
AES = Ec − Ep
DR = (AES / H) × 12 × CF
ACS = AES × RE + DR × RD
PBP = Impl.Cost / ACS
H in DR = max annual operating hours from current fixtures.
CF = 0.77 default (Focus on Energy TRM 2019).