kW × (1 + F × (bench − PF))
kW × (1 − F × (PF − bench))
ℹ Penalty & bonus factors are utility-specific tariff coefficients. We Energies standard: 0.65 below / 0.50 above. Verify against the actual rate schedule.
03 Monthly Energy Document Data
Clear
📋 Sample: Silgan (WEC 0.90) 📋 Sample: Thermo King 📋 Sample: Plymouth Tube (WEC 0.85)
Month Actual PF Measured Demand (kW) Energy (kWh) Demand Rate ($/kW)
Average / Total - - - -
ℹ Enter 12 months of energy document data. Actual PF = power factor recorded on bill. Measured Demand = peak kW demand. Demand Rate = $/kW charge rate (from tariff/rate schedule, not total bill amount).
04 Capacitor Bank Sizing
Quick sizes: 50 kVAr 100 kVAr 150 kVAr 200 kVAr 250 kVAr 300 kVAr 350 kVAr 400 kVAr
-
05 Live Results
Enter energy document data
to compute savings
📄 Generate Word Report

Generates a complete .docx following the IAC assessment template - DOPC formulas, monthly bill tables, savings table, IC breakdown & payback.

∑ Formula Reference
BD = PD × (1 + 0.65×(PFb−PF)) if PF < PFb
BD = PD × (1 − 0.50×(PF−PFb)) if PF ≥ PFb
DOPC = BD × DR
kVAractual = kWavg × √((1/PF)²−1)
kVAradj = max(0, kVAract − kVArcap)
PFadj = kWavg / √(kW²+kVAradj²)
ACS = Σ(DOPCact − DOPCadj)
IC = kVAr × $/kVAr × (1+tax%) + Install
Payback = IC / ACS
PD = measured peak demand (kW from bill).
kWavg = energy (kWh) / hours in month.
BD = billed demand after PF adjustment.